How Long Does It Take to Manufacture a Vibratory Bowl?
There is no fixed timeline, as it’s a custom process. A standard bowl typically takes 2 to 8 weeks, with complex projects requiring more time.
1. Design & Complexity
Simple Parts: Easy-to-orient parts require less design time.
Complex Parts: Irregular parts need longer design and simulation.
2. Bowl Size & Track Fabrication
Small Standard Bowls: Faster to manufacture.
Large/Complex Bowls: More time for machining and assembly.
3. Surface Treatment
Standard Finishes: Add little time.
Special Coatings: Like non-stick coatings, add 3-7 days.
4. Tuning & Sample Testing
This is the most critical phase. It requires反复调试 with customer parts.
Simple Parts: May take 3-5 days.
Complex Parts: Can require 1-3 weeks.
5. Production Scheduling & Logistics
Manufacturer’s Schedule: Lead time depends on their workload.
Shipping: Domestic and international transit times must be considered.
In summary, a typical timeline is 4-6 weeks. Clear communication and providing accurate samples are key to ensuring on-time delivery.